Automatic Juice / Tea Drinks Filling Machine
Filling medium: juice/tea or any hot filling drinks
Capacity: 5000~36000bph
Bottle size: 0.2~3L
Bottle material: PET plastic bottle or glass bottle
Contact Us Now
Product Video
Machine Detail
Washing Heads: The bottle rinsing cramps are of stainless steel clipping structure, which is out of touch of the screw thread of bottle mouth, with stable bottle clipping and high-efficient bottle rinsing.
Filling Heads: The parts with contact to product are made of 304 stainless steel. The outer and inner surfaces of filling cylinder have been treated by mirror finish,and filling cylinder is aseptic treatment. The water filling machine applies filling cylinder and bottle ascending and descending to keep it clean.
Capping Heads: Applies Germany technology with magnetic capping. Can protect the system in overloading, with stable & reliable capping torque. There are no cap biting, higher capping, inclined capping and hemming.
Technical Parameter
Model | Capacity | Overall dimenstion | Power | Weight |
---|---|---|---|---|
JR14-12-4 | 4000BPH | 2400*1900*2800 | 3kw | 4000kg |
JR16-16-5 | 6000BPH | 2600*1900*2200 | 3kw | 4500kg |
JR18-18-6 | 8000bph | 2800*2050*2200 | 3kw | 5000kg |
JR24-24-8 | 12000bph | 3100*2250*2800 | 4kw | 6500kg |
JR32-32-10 | 15000BPH | 3600*2900*2900 | 5.5kw | 8000kg |
JR40-40-10 | 18000BPH | 4250*3250*2900 | 7.5kw | 9500kg |
JR50-50-12 | 20000BPH | 5200*3700*3000 | 11kw | 13000kg |
JR60-60-15 | 24000BPH | 6300*4400*3000 | 11kw | 16000kg |
JR72-72-16 | 32000BPH | 6900*4950*3000 | 11kw | 17000kg |
JR80-80-18 | 36000BPH | 7600*5100*3000 | 15kw | 19000kg |
JR100-100-20 | 40000BPH | 9800*6600*3000 | 18.5kw | 25000kg |
Company Profile

1. The biggest manufacturer of filling machine in Jiangsu Province in China
2. Nearly 30 years experience in water, juice, carbonated drink complete line
3. 150,000 square meter of land
4. 300,000 square meter of modern standard house
5. Equipment is exported to all over the world
After-sales Service
1. Immediately engineer sending after visa and ticket ready
2. Over 10-year experienced engineers for machine installation and training
3. 7 days /week online for customer’s trouble shooting after installation
4. 1000㎡ spare parts warehouse ensure quick delivery within 12hours for urgent spare parts replacement