Glass Bottle Juice Filling Machine
Filling medium: juice etc
Capacity: 3000~30000bph
Bottle size: 0.2~2L
Bottle material: glass bottle
Cap type: crown cap
Contact Us Now
Product Video
Machine Detail
Washing Heads: Bottle transmission adopts the bottleneck clamping technology throughout the whole process. Changing the bottle shape does not need to adjust the height of the equipment. The glass bottle juice filling machine only needs to replace the arc guide plate, dial wheel and other nylon parts related to the bottle diameter.
Filling Heads: The glass bottle filling machine completes the three processes of bottle washing, filling and capping at one time, with little bottle wear, accurate and stable transmission, and convenient bottle type replacement. High-speed and large-flow gravity filling valve, fast filling speed, accurate liquid level without liquid loss.
Capping Heads: The bottle bottom support plate of the bottle output wheel adopts a spiral descending method, and the height of the bottle conveyor chain is not required to change the bottle shape.
Technical Parameter
Model | Capacity | Overall dimenstion | Power | Weight |
---|---|---|---|---|
JR14-12-4 | 4000BPH | 2400*1900*2800 | 3kw | 4000kg |
JR16-16-5 | 6000BPH | 2600*1900*2200 | 3kw | 4500kg |
JR18-18-6 | 8000bph | 2800*2050*2200 | 3kw | 5000kg |
JR24-24-8 | 12000bph | 3100*2250*2800 | 4kw | 6500kg |
JR32-32-10 | 15000BPH | 3600*2900*2900 | 5.5kw | 8000kg |
JR40-40-10 | 18000BPH | 4250*3250*2900 | 7.5kw | 9500kg |
JR50-50-12 | 20000BPH | 5200*3700*3000 | 11kw | 13000kg |
JR60-60-15 | 24000BPH | 6300*4400*3000 | 11kw | 16000kg |
JR72-72-16 | 32000BPH | 6900*4950*3000 | 11kw | 17000kg |
JR80-80-18 | 36000BPH | 7600*5100*3000 | 15kw | 19000kg |
JR100-100-20 | 40000BPH | 9800*6600*3000 | 18.5kw | 25000kg |
Company Profile

1. The biggest manufacturer of filling machine in Jiangsu Province in China
2. Nearly 30 years experience in water, juice, carbonated drink complete line
3. 150,000 square meter of land
4. 300,000 square meter of modern standard house
5. Equipment is exported to all over the world
After-sales Service
1. Immediately engineer sending after visa and ticket ready
2. Over 10-year experienced engineers for machine installation and training
3. 7 days /week online for customer’s trouble shooting after installation
4. 1000㎡ spare parts warehouse ensure quick delivery within 12hours for urgent spare parts replacement